Industrial Fire Safety Case Study · Case Study

Fire Protection System — Saipem

Crestmark designed, procured, installed, and commissioned an integrated active fire-protection system for Saipem Contracting Nigeria. Scope covered a hydrant ring main, deluge system for critical process areas, gaseous suppression for control rooms, and an addressable fire-alarm system tied to the plant SCADA.

Location
Nigeria
Client
Saipem Contracting Nigeria
Completion
Q4 2023
Value
Confidential
Objectives

What the project set out to do

  • Deliver a fully integrated life-safety system to NFPA and Saipem engineering standards
  • Complete installation and cold/wet commissioning within programme
  • Provide operator training and O&M documentation
Challenges

What we were up against

Multi-standard compliance

The installation had to satisfy NFPA 13/15/20/72, API 2001, and Saipem's internal engineering specifications simultaneously.

Live-facility interfaces

Tie-ins to existing plant infrastructure required detailed permit-to-work coordination and out-of-hours execution windows.

Approach

How we delivered

Modular skid delivery

The fire-pump house was delivered as a factory-tested skid, minimising on-site work in the operational plant.

Third-party witnessed testing

Every hydrostatic and functional test was witnessed by an independent inspection agency, protecting handover certainty.

Engineering

The hydraulic design was fully modelled to NFPA 13 with hydraulic calculations validated against the fire-pump curves selected. Deluge zones were engineered around the client's fire-risk assessment, with cause-and-effect logic implemented in the addressable fire-alarm panel.

Execution

All process pipework was fabricated off-site in a controlled workshop, with prefabrication reducing on-plant weld count by 62%. Welders were ISO 9606 qualified; every butt weld was NDT-inspected.

Quality

The completed system passed all client witness tests on first attempt, including full deluge activation, alarm integration, and pump start-up sequences. Third-party NDT reports were included in the handover dossier.

Outcome

The fire-protection network was accepted by the client with zero remedial actions and continues to protect a critical Saipem-operated asset.

Ready to start?

Let's engineer what's next.

Talk to our commercial team about your project — from feasibility through delivery, we tailor scope to fit your programme, budget, and risk profile.