Construction

Building Construction

Crestmark delivers turnkey building construction across Nigeria — from substructure and superstructure to façade, finishes, and MEP integration. Our teams execute to international specifications with rigorous programme control, safety oversight, and quality assurance embedded at every stage.

Scope of work

What we cover

  • Site clearance, setting-out, and enabling works
  • Reinforced concrete substructure and superstructure
  • Structural steel fabrication and erection
  • External envelope: masonry, curtain wall, cladding
  • Internal finishes to specification
  • Integrated MEP first-fix and second-fix coordination
  • Testing, commissioning, and handover
Methodology

How we deliver

01
Pre-construction

Constructability review, method statements, procurement plan, baseline programme (Primavera P6), and site logistics.

02
Execution

Daily supervision, weekly cost/programme reporting, tiered QA/QC inspections, and rigorous NEBOSH-aligned HSE control.

03
Closeout

As-built documentation, O&M manuals, snagging, PC certification, and defects-liability support.

FAQ

Common questions

What contract forms do you work under?+
We deliver under lump-sum, remeasurement, design-and-build, and construction-management contracts, referenced to FIDIC or NIQS forms as required.
How do you manage programme risk?+
Every project runs on a Primavera P6 baseline with weekly earned-value reporting, critical-path recovery plans, and escalated variance triggers reviewed by executive management.
Trusted by operators, banks, and government
Saipem
Federal Ministry of Works
Nigeria Police Force
NLNG
Chevron
Dangote Group
Julius Berger
Access Bank
PZ Cussons
Meridian Holdings
Everyday Group
Cross River State
Client voices

What our clients actually say.

Every quote below is tied to a real, delivered outcome. Attribution is provided; project details available on request.

"Crestmark's fire-protection team turned around our hydrant ring main and pump-house tie-in without a single unplanned outage on the operating plant. Their weld packs and NDT documentation went into our handover dossier untouched."
Engr. F. Umoh
Project Engineering Lead · Saipem Contracting Nigeria
Zero remedial actions at handover
"They rebuilt the Ota–Sango corridor while keeping it open to daily traffic. Drainage capacity, walkways, and lighting have transformed how the community uses the road."
Hon. B. Adebanjo
Special Adviser, Infrastructure · Ogun State Government
6.4 km delivered on programme
"Grade A tenants don't tolerate snags. Crestmark handed our floor plates over ready for fit-out and hit the trading date we needed to protect our pre-lets."
T. Ogundipe, FRICS
Development Director · Meridian Corporate Holdings
92% pre-let within six months of PC
Ready to start?

Let's engineer what's next.

Talk to our commercial team about your project — from feasibility through delivery, we tailor scope to fit your programme, budget, and risk profile.