MEP & Systems

Fire Protection Systems

Crestmark is a specialist installer of active fire-protection systems — from wet and dry sprinkler networks to gaseous suppression, deluge, and fire alarm systems — with delivery credentials on major industrial installations including Saipem.

Scope of work

What we cover

  • Sprinkler systems (wet, dry, pre-action, deluge)
  • Hose-reel and hydrant networks
  • Gaseous suppression (FM-200, Novec, CO₂)
  • Addressable fire alarm and voice evacuation
  • Fire pumps and jockey sets
  • Passive fire-stopping
Methodology

How we deliver

01
Design

Hydraulic calculations to NFPA 13/15/20, addressable-alarm zoning to NFPA 72.

02
Install

Grooved-piping systems, certified brazing, and third-party witnessed pressure tests.

03
Commission

Wet and dry commissioning, integrated cause-and-effect testing, and authority sign-off.

FAQ

Common questions

Have you delivered fire systems for oil and gas majors?+
Yes — including the construction of the fire-protection system for Saipem, executed to international oil-and-gas standards.
Trusted by operators, banks, and government
Saipem
Federal Ministry of Works
Nigeria Police Force
NLNG
Chevron
Dangote Group
Julius Berger
Access Bank
PZ Cussons
Meridian Holdings
Everyday Group
Cross River State
Client voices

What our clients actually say.

Every quote below is tied to a real, delivered outcome. Attribution is provided; project details available on request.

"Crestmark's fire-protection team turned around our hydrant ring main and pump-house tie-in without a single unplanned outage on the operating plant. Their weld packs and NDT documentation went into our handover dossier untouched."
Engr. F. Umoh
Project Engineering Lead · Saipem Contracting Nigeria
Zero remedial actions at handover
"They rebuilt the Ota–Sango corridor while keeping it open to daily traffic. Drainage capacity, walkways, and lighting have transformed how the community uses the road."
Hon. B. Adebanjo
Special Adviser, Infrastructure · Ogun State Government
6.4 km delivered on programme
"Grade A tenants don't tolerate snags. Crestmark handed our floor plates over ready for fit-out and hit the trading date we needed to protect our pre-lets."
T. Ogundipe, FRICS
Development Director · Meridian Corporate Holdings
92% pre-let within six months of PC